The group has taken component in the producing and revising of ISO/TC100 global chain normal numerous a long time in good results and hosted the sixteenth ISO/TC100 Global annual meeting in 2004.
Overview
Quick Information
- Relevant Industries:
-
Production Plant
- Manufacturer Name:
-
OEM
- OEM Service:
-
Support
- Tolerance:
-
.01-.05mm or Personalized
- Certification:
-
ISO9001, SGS
- Floor Treatment:
-
Sandblasting,Polishing,Anodize, Zinc,Nickel,Chrome,Plating, and so on.
- Application:
-
Vehicle,Healthcare Equipments,Electrical Equipment,Hardware,and many others.
- Dimension:
-
As Customers’ Request
- Equipment:
-
Milling/Lathe/Drilling/Four/A few Axis CNC Machining Center
- Drawing Structure:
-
Professional/E, Automobile CAD, Strong Works,IGS,UG, CAD/CAM/CAE
Provide Capability
- Provide Capability:
- 10000 Piece/Parts for each Thirty day period
Packaging & Supply
- Port
- nb
-
Direct Time
: -
Amount(Items) one – 500 >500 Est. Time(times) thirty To be negotiated
Online Customization
Technical innovation good workmanship high demand from customers cnc machining components vehicle human body components
Item Description
Product Kind | CNC turning, milling, drilling, grinding, wire EDM chopping and so forth. |
Our Companies | CNC Machining,Plastic Injection,Stamping,Die Casting,Silicone And Rubber,Aluminum Extrusion,Mould Generating,and so on |
Material | Aluminum,Brass,Stainless Metal,Copper,Plastic,Wooden,Silicone,Rubber,Or as for every the customers’ needs |
Surface Remedy |
Anodizing,Sandblasting,Portray,Powder coating,Plating,Silk Printing,Brushing,Sharpening,Laser Engraving |
Dimension | As customers’ request |
Service Project | To offer generation design and style, production and complex services, mould development and processing, and so on |
Drawing Structure: | PRO/E, Auto CAD, Solid Works,IGS,UG, CAD/CAM/CAE |
Testing Equipment | Digital Height Gauge, caliper, Coordinate measuring device, projection equipment, roughness tester, hardness tester and so on |
Industry utilized | Machinery heavy responsibility gear electronic device Automobile spare parts optical telecommunication |
Packing | Eco-pleasant pp bag / EPE Foam /Carton containers or picket boxes As customer’s certain needs |
Trial sample time | 7-10 days right after confirmation |
Delivery time | 7-thirty times after receive the pre-payments |
Payment Phrases | T/T,Western Union,Paypal |
OEM Services
OEM Elements
Area Therapy
Creation Process
Why Us